Video: Append Tasks during MS Project Refresh
Learn how to append tasks when you Refresh your schedule from MS Project.
You can also use a Flag field to limit which tasks get appended, and you can use a Number field to tell Milestones which row to place the task on.
See the video on YouTube below.
If you don’t have access to YouTube, check out our .MP4 Downloadable Milestones Professional Videos Page
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
March and February 2022 Tips and Tricks
For these and more, view Tips and Tricks for February 2022 and also the Tips and Tricks for March 2022
Adjust task row height with automation
Is there a way to change the height of a row using Milestones Professional Automation?
Symbols above the bar
I am trying to show symbols above a bar, like this example. Can you tell me what the trick is?

Number of Vertical Links
How many vertical links can start from a single symbol?
For timing charts Heading frequency only goes to 60
We use milestones for schedules and also for machine timing charts. When doing timing charts, we usually use 1 day as equal to 1 second. When cycles are really short, then we use 1 day equal to 1 millisecond, so 1000 days is equal to 1 second. We have a header type (within Date Headings Dialog Box) of Daily 1,2,…30, 31,32,33… Even though the frequency settings allows entry of numbers above 60, it seems to not change anything on the header. So the time breakup in header for frequency of any value above 60 is always 0—-60—120—180…… and is not readable due to everything running together. Is there a way to change this so that the header is 0–250—500—750—1000?
Save version 2021 schedule in an earlier version’s format
My coworkers still have Milestones Professional 2019 and I need to share my schedule with them. How do I do this? I have version 2021.
Track deliveries
I have a schedule I am importing from Microsoft Project. Each time we do a delivery we have a task in Microsoft Project which has the word delivery. I would like to create a schedule which displays the delivery dates and also shows the total number of deliveries per month. Is anything like this possible?
Tasks omitted from curtain shading
When I use the curtain/shading option, certain tasks are omitted from the shading, why is this?

Move symbols ahead by 2 months
How can I move a group of symbols about 2 months to the right all at the same time?

Horizontal bar has white stripe
I am using Milestones Professional to build a chart for our management. The task bars I am inserting (which should be solid) have a white stripe through the middle of them. Here’s a picture.

Custom Headers and Footers
I need to display custom header and footer information on all pages of my schedule. Is this possible?

What can affect Fill to Status Date?
I have the Symbols: Fill to Status Date and Bars: Fill to Status Date options toggled on. However, it is not working. What could be disabling this feature?
Dashed line for symbol
I want my symbol to look like this. Is it possible?

Remove all baseline or status symbols
I want to remove all of the baseline symbols and status symbols on my schedule. Is there an easy way to do this?
Show curves and bars in DataGraph
I need to create a data graph with both bars and lines on the same DataGraph area. It appears that DataGraphs can either be bar graphs or line graphs, but not a mix. Suggestions?

For these and more, view Tips and Tricks for February 2022 and also the Tips and Tricks for March 2022
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
May 2022 Newsletter
/in News /by KIDASA SoftwareVideo: Vertical Text in Milestones Professional
You can have vertical column text, vertical symbol text, and vertical freeform text.
See how to do that, and some common formatting options for the vertical text in our newest video.
See the video on YouTube below.
If you don’t have access to YouTube, check out our .MP4 Downloadable Milestones Professional Videos Page
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
May 2022 Tips and Tricks
For these and more, view Tips and Tricks for May 2022
Remove line in middle of bar
Can you tell me how to remove the line in the middle of the bar? It seems to be at the schedule’s current date.
Apply a template to an existing schedule
When I apply a template to an existing schedule, the symbols and connectors do not look as I expected. What could cause this?
Change the default save location
I would like to change the default location where charts are saved. How can I do this?
Cleaner summary bar
On my Summary line is there any way to make the appearance cleaner? The Project 8 and Project 10 symbols are overlapping:
Baseline symbols
I have created a schedule for proposal purposes, and I want to turn it over to the execution team. The execution team wants to be able to maintain the original schedule bars, but include actual bars that they can status. What’s the best way to do this?
Automatic word wrap
I imported my Microsoft Project schedule but some of the text doesn’t show in the columns. I know I can increase the row height and see everything. Just wondering if there is an automatic way to do this.
Link two symbols to show a date range
If I want to link two symbols with a line to show a date range in dates, how do I do that? For example:
For these and more, view Tips and Tricks for May 2022
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
April 2022 Newsletter
/in News /by KIDASA SoftwareVideo: Insert a Baseline
Learn how to insert a baseline into your Milestones Professional schedule.
This video also shows you how to set up your Baseline task and summary options as well.
See the video on YouTube below.
If you don’t have access to YouTube, check out our .MP4 Downloadable Milestones Professional Videos Page
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
April 2022 Tips and Tricks
For these and more, view Tips and Tricks for April 2022
Best way to set up a schedule for easy updating
What is the best way to approach creating a schedule in Milestones Professional so I can make global changes to symbols and horizontal bars currently on the schedule?
Can’t pick Project file name when refreshing
Usually when I go to refresh a Milestones Professional schedule from Project, I am asked to select the Microsoft Project file name. I have one schedule (only one!) which never prompts me to select a file and I wonder what’s going on. Any ideas?
Fiscal and calendar quarters
How can I have fiscal quarters and calendar year quarters, as shown above?
Hyperlink from schedule to document
I need to add a page of text explaining why any scheduled date has changed. Is there a way I can link “Milestones” to a “Word” document?
Find a string in one of my Milestones files
I often forget where I put my Milestones schedules and have trouble finding them. Help!
Remove password on my Milestones schedules
I would like to remove the password on all my Milestones Professional charts. I have approximately 12. Do I really have to send them to you to remove the password.
Password protecting your schedules
We keep our schedules in a shared folder on our server. Can we control who has access to each Milestones schedule?
Filter to bring in just part of a Microsoft Project plan
When I am importing an Microsoft Project plan, Microsoft Project loads all tasks (and Milestones) of the plan. That’s too much because the plan consists more than 2500 tasks. Only the major work packages, not every task are relevant to the report I want from Milestones Professional. Is there a way to only load certain tasks such as up to level 3?
For these and more, view Tips and Tricks for April 2022
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
March 2022 Newsletter
/in News /by KIDASA SoftwareVideo: Append Tasks during MS Project Refresh
Learn how to append tasks when you Refresh your schedule from MS Project.
You can also use a Flag field to limit which tasks get appended, and you can use a Number field to tell Milestones which row to place the task on.
See the video on YouTube below.
If you don’t have access to YouTube, check out our .MP4 Downloadable Milestones Professional Videos Page
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
March and February 2022 Tips and Tricks
For these and more, view Tips and Tricks for February 2022 and also the Tips and Tricks for March 2022
Adjust task row height with automation
Is there a way to change the height of a row using Milestones Professional Automation?
Symbols above the bar
I am trying to show symbols above a bar, like this example. Can you tell me what the trick is?
Number of Vertical Links
How many vertical links can start from a single symbol?
For timing charts Heading frequency only goes to 60
We use milestones for schedules and also for machine timing charts. When doing timing charts, we usually use 1 day as equal to 1 second. When cycles are really short, then we use 1 day equal to 1 millisecond, so 1000 days is equal to 1 second. We have a header type (within Date Headings Dialog Box) of Daily 1,2,…30, 31,32,33… Even though the frequency settings allows entry of numbers above 60, it seems to not change anything on the header. So the time breakup in header for frequency of any value above 60 is always 0—-60—120—180…… and is not readable due to everything running together. Is there a way to change this so that the header is 0–250—500—750—1000?
Save version 2021 schedule in an earlier version’s format
My coworkers still have Milestones Professional 2019 and I need to share my schedule with them. How do I do this? I have version 2021.
Track deliveries
I have a schedule I am importing from Microsoft Project. Each time we do a delivery we have a task in Microsoft Project which has the word delivery. I would like to create a schedule which displays the delivery dates and also shows the total number of deliveries per month. Is anything like this possible?
Tasks omitted from curtain shading
When I use the curtain/shading option, certain tasks are omitted from the shading, why is this?
Move symbols ahead by 2 months
How can I move a group of symbols about 2 months to the right all at the same time?
Horizontal bar has white stripe
I am using Milestones Professional to build a chart for our management. The task bars I am inserting (which should be solid) have a white stripe through the middle of them. Here’s a picture.
Custom Headers and Footers
I need to display custom header and footer information on all pages of my schedule. Is this possible?
What can affect Fill to Status Date?
I have the Symbols: Fill to Status Date and Bars: Fill to Status Date options toggled on. However, it is not working. What could be disabling this feature?
Dashed line for symbol
I want my symbol to look like this. Is it possible?
Remove all baseline or status symbols
I want to remove all of the baseline symbols and status symbols on my schedule. Is there an easy way to do this?
Show curves and bars in DataGraph
I need to create a data graph with both bars and lines on the same DataGraph area. It appears that DataGraphs can either be bar graphs or line graphs, but not a mix. Suggestions?
For these and more, view Tips and Tricks for February 2022 and also the Tips and Tricks for March 2022
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
January 2022 Newsletter
/in News /by KIDASA SoftwareVideo: Valuesets (1 and 3) and Datagraphs
Using a Type 3 valueset, you can spread column values over the duration of each task, and have them graphed automatically on the bottom of the schedule.
You can also use a Type 1 valueset if you’d like to manually enter data for each date range.
See the video on YouTube below.
If you don’t have access to YouTube, check out our .MP4 Downloadable Milestones Professional Videos Page
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
January 2022 Tips and Tricks
For these and more, view Tips and Tricks for January 2022
Line thickness in PDF files
Why are the line weights so heavy when creating a PDF? It really makes the schedule hard to read and is not good for presentations. Is there something I can do to fix this?
Bar colors change unexpectedly after refresh
I have a schedule with several joined bars. P3 is supposed to be filled blue but stays white. Then, after I refresh, the bar for P2 disappears and P3 fills as expected:
See bar status color in toolbox
My bars are all the same color before status, but they have a different after status color, how do I tell them apart in the toolbox?
Get list of all Project UIDs in Milestones schedule
I’m using Symbol Links to an MS Project file. Is there a way to get a list in Milestones Pro of all the UIDs I am linked to?
Numbers or letters inside symbols
I need to have numbers inside my triangle symbols. Right now I am using symbol text and the text is pretty small and hard to re-size when the symbol sizes change. Is there an easier way to do this?
Force a symbol to be “on top”
I have two different symbols that appear on the same day. I want to be able to choose which symbol appears on top. Is this possible?
Need to change UIDs in Milestones as Project UIDs have all changed
A significant number of tasks in my Project file have been reassigned new UID’s, and I need to manually re-establish them in Milestones Pro. I can see them in the automation tag report, but is there a way to mass-delete them, without having to click every symbol and remove the tags manually?
Change the font size of many symbols at once
I want to change the font size of all symbols of a certain type. Do I need to select the symbols individually and change them one by one?
For these and more, view Tips and Tricks for January 2022
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
December 2021 Newsletter
/in News /by KIDASA SoftwareVideo: Make a Christmas Tree in Milestones Professional 2021
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
December 2021 Tips and Tricks
For these and more, view Tips and Tricks for December 2021
Make the schedule more compact
How do I get a multi-page schedule down to one page?
Entered percent complete changes to different value
When using a Percent Complete SmartColumn, I enter a percent complete value, e.g. 72%, and the value is then displayed as another value, e.g. 80%. Why is that and how can this be corrected?
Focus on certain months in a year
Are you able to focus in on certain months within a year, (i.e. – adjust the timescale) so that the timescale will be more compact in outlying years/months granting more space in the area around time now?
Toolbox drawing tools are grayed out
I can’t seem to invoke the “line, box, circle” row in my toolbox. It remains grayed out. What am I doing wrong? I am using the Standard Toolbox view. I really need the “line tool” right now.
Erase blue boxes around symbol descriptions
I cannot figure out how to erase the blue box around the task descriptions that are imported from MS Project.
Hide the dates on summary lines
When I roll-up all lower-level task bars to the summary line, I would like to hide the symbol dates. Is this possible?
For these and more, view Tips and Tricks for December 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
November 2021 Newsletter
/in News /by KIDASA SoftwareVideo: Import, Link, Refresh from Primavera P6
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
Dashboard Chart Examples
Automobile dashboards advanced over time, now, giving a full view of the car’s operations. No more kicking tires to see how the car is performing.
Don’t wait for a blow out on your project, use Milestones Professional to create a project management presentation dashboard for an overview of how well your project is performing.
With Milestones Professional show Progress, Budget, Status, Percent Complete, Indicators in your project management presentation dashboard.
See our Dashboard Chart Examples page
November 2021 Tips and Tricks
For these and more, view Tips and Tricks for November 2021
Add a date to a note
Is there a way to have the date be part of the Note?
Customize the toolbox
I notice that the Milestones schedules all have different toolboxes. Can I customize my toolbox so that when I create new schedules, I always start with the same toolbox?
Lock symbols to a date when moving to another row
Is there any way to lock the symbol date when moving from one task row to another task row?
Three ways to add vertical links
I need to add a vertical links on my schedule. Sometimes symbols to be linked are on separate pages, sometimes on the same page. What are my options?
Fill a symbol when complete
Is there a way to have the date be part of the Note?
Design symbols for use with Milestones
Is there a way to have the date be part of the Note?
Filter by symbols and date range
We are trying to filter items with more than one symbol for a specific date range. Is there another way to do this?
For these and more, view Tips and Tricks for November 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
October 2021 Newsletter
/in News /by KIDASA SoftwareVideo: Basics Training in Milestones Professional (part 2/2)
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
October 2021 Tips and Tricks
For these and more, view Tips and Tricks for October 2021
Adjust the position of symbol within a task row to relieve crowding
Symbols on a task row are close together, if not on top of each other. How can I display them better?
Assign specific text to a toolbox symbol
Is there any way that I can assign each toolbox symbol to have a specific letter or string of text to it or to include the task name next to each symbol automatically so I don’t have to do it manually?
Add a percent complete symbol in a column
How do I add a percent complete symbol to a column?
Change the start and end dates for a schedule
Right now my schedule only shows 3 months. I want it to include all the months in the current year. How is this done?
Choose default symbols and bar to use for summary tasks
I want to change the symbols used for the summary bars. How do I do this?
Need to do a detailed 1-wk schedule
I need to present a chart showing work performed on a project over the course of a week. I need to set up more than one entry per day per line. I would like to be able to schedule work in 15 – 30 min increments. Is there any way to accomplish this with your software ?
Hide time in date columns
I only want to show the date in the Start and End date columns. Right now, I see the date plus the time. Is there a way to hide the time?
Hide calendar icons
All of my date columns display small calendar icons. Is there a way to remove these?
Hide several task rows in a single operation
I know how to hide a single task. Is there a way to hide several tasks in a single operation?
Change the shape of a symbol based on status
I would like a symbol to change both color and shape when it’s completed. Is this possible?
Bars not filling in
I imported my Microsoft Project schedule into Milestones Professional. I want the bars to fill to the status date. Most of them don’t do this. Why not?
Automation interface to Milestones
Is there a VBA or Visual Basic interface for Milestones? I use VBA to perform automation from PowerPoint, Excel, Word and Project and it would be useful if I could access Milestones Professional similarly.
For these and more, view Tips and Tricks for October 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
September 2021 Newsletter
/in News /by KIDASA SoftwareVideo: Basics Training in Milestones Professional (part 1)
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
September 2021 Tips and Tricks
For these and more, view Tips and Tricks for September 2021
Dialog box keeps appearing
Sometimes on a schedule I get this message that pops up multiple times. Is there a way to stop it from popping up and is there any action or format I should be looking at? I click okay each time.
Clone a schedule
I have a schedule which I want to replicate for a new project. How can I make a new schedule based on a schedule I already have? The new schedule needs to be the same as the original schedule but, of course, the start date of my new project will be different.
Symbols disappear after refresh
Some of my symbols are disappearing after I refresh the schedule from Microsoft Project. Help!
Symbol text background
The area around my symbol text is blanking out parts of the symbols. Is there any way to change this?
Two digits for fiscal year date headings
I am using fiscal year date headings. Right now they are two digits. I would like to show 4 digits. How is this done?
Create your perfect Milestones toolbox
I want to create a toolbox to use with all of my schedules. Please advise.
Enlarge all symbols of a certain type
I have a bunch of green triangles on my schedule (and many other symbols as well). What I would like to do is enlarge all of the green triangles. I don’t want to change my toolbox. Is there another way to do this?
Show symbols above or below the bar
How do I add a downward pointing triangle, arrow or other symbol to the toolbox so that when added, it adds the milestone below or above the bar? I want to have a bar with several milestones above it but may also want to show milestones below the bar.
For these and more, view Tips and Tricks for September 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
August 2021 Newsletter
/in News /by KIDASA SoftwareArticle: Successfully Present Your Projects
Project managers deal in details; management wants a snapshot. How can you translate your project details into a brief summary which clearly conveys the status of the project? This guide offers methods for how to create clear, concise project reports along with a few tips on what to report when you don’t know where to start.
In the article, you will learn more about these areas:
Read the article: Successfully Present Your Projects
Video: Moving Symbols and Bars in Milestones Professional
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
August 2021 Tips and Tricks
For these and more, view Tips and Tricks for August 2021
Distorted symbols in PowerPoint
Have a problem when copying a Milestone chart with triangles and other symbols into PowerPoint.
Link a Microsoft Project schedule to my Milestones chart
I generated a Milestones Professional schedule from scratch based on the data in one of my Project Files. (I didn’t import them.) So now that I’ve done this, is there a way to link the symbols on the schedule back to the right tasks in Project so I can later update the Milestones symbols and bars whenever the dates in Project change?
Legend and DataGraph Placement
Is it possible to have a Legend and DataGraph(s) shown at the same time?
Lines on ends of bars not showing
When I print my schedule, the lines at the ends of the bars are missing. What could be causing this? I am using symbol shape #28 (blank symbol). On the screen the bars look fine.
Move a symbol and keep the same date
When I move a symbol to another task row, the date changes. I really don’t want it to change. Is there a way to prevent this?
Move Milestones to primary monitor
I am using Remote Desktop to access my computer at work. Sometimes my Milestones software is not visible. I think it’s because it is on my secondary monitor. Is there any way to force it to my primary monitor for Remote Desktop?
Move one symbol only
When I move one symbol on my schedule, other symbols are moving too. Help! I only want to move one symbol.
Move a task to another spot
I would like to move a task to another spot on the same page. How is this done?
For these and more, view Tips and Tricks for August 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.
July 2021 Newsletter
/in News /by KIDASA SoftwareVideo: All About Date Headings in Milestones Professional
Learn all about Date Headings in this video, including Custom Date Headings:
Article: All About Date Headings in Milestones Professional
We also have an article if you’d like to read all about the different date heading options in Milestones Professional.
Read the article: All About Date Headings in Milestones Professional
Be sure to Subscribe to our Youtube Channel for all the latest and greatest Milestones software videos!
July 2021 Tips and Tricks
For these and more, view Tips and Tricks for July 2021
No vertical lines in date headings
We have created a new schedule and in the date headings we have displayed the Months, however there are no vertical lines separating the month titles. I have the vertical lines within the schedule but want the lines in the date headings area too. I have searched high and low…Can you tell me how to add these?
Numbered date headings
I want numbers instead of letters or month names in the date headings. This is for a project proposal. I don’t know when the project will start.
Show dates at the bottom of the schedule
Is there a way to show date headings at the bottom of the schedule?
Date heading only shows letter on some pages
My date heading shows some months with the full name and others with an abbreviation. Is there a way to make it consistent?
For these and more, view Tips and Tricks for July 2021
Upgrade to Milestones Professional 2021
Click here to Upgrade to Milestones Professional 2021 for only $199 (if you already own any version of Milestones Professional). To see what has changed, check out our “What’s New in Milestones Professional 2021” page.
Join the Milestones Professional Users LinkedIn Group
For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users. To join, head over to the following website and click Join: https://www.linkedin.com/groups?home=&gid=6796817
Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.