September 2017 Newsletter

Video: Tips and Tricks #2

Check out our video that contains some cool tips and tricks in Milestones Professional 2017. Be sure to check out our Tips and Tricks #1 Video as well

Upgrade to Milestones Professional 2017

Click here to Upgrade to Milestones Professional 2017 for only $149 (if you already own any version of Milestones Professional).

To see what has changed, check out our “What’s New in Milestones Professional 2017” page.

September 2017 Tips and Tricks

For these and more, view Tips and Tricks for September 2017

Filter using a text field
Let’s say I import my entire schedule from Project. Can I filter on a value in one of my columns so that only the tasks I want are displayed? I need to switch between views of 4 different teams without have to do the import separately for each team.

Bars not filling in
I imported my Microsoft Project schedule into Milestones Professional. I want the bars to fill to the status date. Most of them don’t do this. Why not?

Templates
Is it possible to change my default save location for templates?

Show two date lines
Am I able show two date lines using Milestones Professional? For example, I want to show a status line ( i.e. Sept 8, 2017) and a date line that’s in the future (i.e. Oct 1, 2018).

Delete a vertical link
Is there a way to delete or remove a vertical connection once it has been created?

For these and more, view Tips and Tricks for September 2017

Join the Milestones Professional Users LinkedIn Group

For anyone interested, there’s a free Milestones Professional user group on LinkedIn you can join to share best practices, network with other users, and maybe learn some tips along the way from other experienced Milestones users.

To join, head over to the following website and click Join:
https://www.linkedin.com/groups?home=&gid=6796817

Note: This user group is an unofficial group run by Milestones software users, and is not managed by KIDASA Software, Inc. A free LinkedIn account is required to join the group.